![]() ![]() Check for tool errors by calculating mud hydrostatic pressures at different depths from mud weight check them against measured mud hydrostatic pressures at the same depths. Today we wrap our minds around the beast that is the RF Entangler from Quantum Flux and try to set up infrastructure at a new base location.Thanks for watchi.Take mud hydrostatic pressures while descending into the hole to give the instruments time to equilibrate to changing temperature and pressure and to provide a mud hydrostatic pressure profile.Entangler, VGrbrodder, ver- ftrikker, Enter 9 Ingaan, intreeden. Maintain a slight overflow of mud to keep the level in the borehole constant during the survey and to prevent mud hydrostatic pressure errors. /oorr gw 0 c/rfp, tie deuren klapten geweldig z clap of thunder, een don.Normalize to one another after completing the survey. Run quartz and strain gauges simultaneously.Inspect the tool and check calibration before going in the hole.The list below describes how to control RFT quality. Plot pressures at the same scale as well logs to aid in interpretation.Sample both water- and hydrocarbon-bearing intervals to establish both the water and hydrocarbon pressure gradients.Repeat at some of the same depths for multiple surveys to help normalize the different surveys.Occasionally repeat formation pressure measurements at the same depth to check for consistency.Plot mud hydrostatic and formation pressure at the well site to recognize anomalies or tool errors and to optimize station coverage.Use well logs to pick permeable zones for formation pressure measurements.The list below explains how to operate an RFT survey (see Gunter & Moore ). Points are similar to points on a DST pressure profile. Good if many layers are included in tested intervalįigure 3 Typical RFT pressure-time profile.įigure 3 is a typical RFT pressure-time profile. Screen plugging with material in drilling mud.Several feet or more generally tests multiple flow units The RFT usually requests similar information to an RFI, plus specific metrics. Less than 5 minutes for permeable formationsĪbout one logging run (wireline conveyed)Ībout equal to two trips with drillstring An RFT is procurement’s open invitation for suppliers to respond to a defined need as opposed to a vague request. The table below lists some considerations. Fluid samples from the formation can also be taken with the tool.ĭifferences between RFTs and DSTs Īn RFT has several important advantages for formation pressure measurement over a DST. Formation pressure is measured by the formation sampler ( Figure 1) when it is extended from the tool to contact the formation. The diagram below shows a typical RFT tool. ![]() It measures pressure at specific points on the borehole wall. The repeat formation tester (RFT) tool was designed to measure formation pressure quickly and accurately. Figure 1 Formation pressure is measured by the formation sampler when it is extended from the tool to contact the formation. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |